The size and scope of a project such as the Banyu Urip oil field always poses a challenge for safety. The project included construction of infrastructure facilities, oil processing facilities, and wellpads for the drilling of oil and natural gas. The project also required building facilities for processing the oil once it was delivered, including fuel gas treatment, water treatment, and power generation plants. Employees in this type of work environment are faced with innumerable hazards. Without strong leadership to support safe work, numerous and significant risks can quickly multiply, creating long-lasting difficulties and problems for the entire organisation. Prior to DEKRA Insightās engagement, the project had not achieved 10 consecutive āHurt Free Daysā in almost two years of mobilisation. Hurt Free Days were measured in accordance with the global Exxon Mobil reporting metric.
Download this case study to read the full story.